The strategic goal of the ELY4OFF is the design and engineering of a robust, flexible, highly efficient and cost-competitive PEMWE. This will be automatically controlled using cutting-edge operational capabilities under highly dynamic power supplies required for direct coupling to RES generation. The final design of the PEMWE will be achieved on the basis of the development, validation and demonstration of a PEMWE industrial prototype of 50 kW comprising: cylindrical stack (to be able to produce hydrogen under high pressure) consisting of industrial size elementary cells, balance of plant (BOP), power electronics, advanced communication & control system, and peripheral equipment and end applications.
Mentioned validation and demonstration will be held in the premises of the Aragon Hydrogen Foundation, which will be tailored to fit the project requirements as solar power and isolation from the mains, so that the results obtained are representative.